Junctions and Thunder

Big drops
Big drops

The promised Wednesday evening thunder, sort of, materialised. The rain had impressively large drops. And we had one roll of thunder. I think it was very localised and I was moored right on the edge of the storm. Apparently, Middlewich had flash floods.

By Thursday, the need for services was becoming more urgent. Especially water. Even with just one human on board, doing the washing and having a shower can use up a good amount of it. I decided to do the short trip through Nantwich and onto the Middlewich Branch.

Hack Green Top Lock
Hack Green Top Lock

But first, there were the two locks at Hack Green. There’s a handy information board there giving even more detailed information about the Secret Bunker. Turns out it was originally a radar station and was only converted to be a Regional Seat of Government in the 1980’s, before being decommissioned in the 90’s.

Horsey
Horsey

The canal passes through Nantwich on a significant embankment, dotted with the occasional wooden sculpture. This sculpture trail either begins or finishes with this large horse, depending on which direction you are going. It looks like it is the new fashion to have big sculptures of horses next to canals. At least in Nantwich and Falkirk.

At Nantwich we took on water, and got rid of some “stuff”. Quite a queue developed. My water tank was quite low, the tap was slow and there was only one of them. The guys who pulled in to use it after me were getting quite frustrated. At least they had a secure mooring on the wharf, the other 2 boats had to wait over the other side of the canal due to the limited space.

Nantwich Services - before the queue developed
Nantwich Services – before the queue developed
Hurleston Junction and Locks
Hurleston Junction and Locks

Shortly after leaving Nantwich, it was time to resist, seriously resist, the temptation of the Llangollen Canal. It begins at Hurleston junction, with a flight of locks the ascend up the hill from the Shropshire Union. This canal is one of our favourites, and the first canal that Heather fell into. No, that’s not the reason that it’s a favourite. I think it is the way it combines climbing from the Cheshire Plain into the Welsh Hills, with an impressive canal icon in the Pontcysyllte Aqueduct. There’s even a steam railway at the far end if you are into that sort of thing.

Llangollen - soon!
Llangollen – soon!
A reservoir not a hill
A reservoir not a hill

I resisted, but now Heron is going to be based up here, we won’t be resisting for long. We have travelled this stretch, from Hurleston to Barbridge junctions, many times. The large mound or hill next to the canal is actually the dam for the Hurleston Reservoir, which is fed by the Llangollen. The canal is fed by water from above the man-made Horse Shoe Falls, and it brings that water all the way to Hurleston to supply urban centres in this part of Cheshire. Seeing this view was always a good sign that the Llangollen was just around the corner.

Middlewich this way
Middlewich this way

Barbridge Junction turned out to be quite busy, with boats taking on water, boats turning out of the junction and boats coming south towards me. Here it was time to turn onto the Middlewich Branch. A little bit of wind meant I almost didn’t make the turn. Not sure that Sam was too impressed. Then we presented with a very familiar view, with boats lining both sides of the cut down to the junction. If you ever plan on mooring on the end of the Middlewich Branch, next to the junction, forget it.

 

 

Barbridge Junction on Middlewich
Barbridge Junction on Middlewich
Deep
Deep

There were two more locks to do before I planned on pulling over. First at Cholmondeston, next to Venetian Marina. There was a very helpful CRT volunteer there. Which was handy, because this is the deepest lock I have done so far. Venetian was one of the possible mooring locations we considered for Heron. It is quite a bit larger than I remembered it, because they have expanded. We tackled Minshull Lock on out own. And boy is it a deep one too. Over 11 feet. Thankfully for the vertigo susceptible, there are little bridges over the downstream end (like on the T&M). Sam did not know quite what to make of a lock this deep.

Little Bridges
Little Bridges
Dreaded Minshull Lock approach
Dreaded Minshull Lock approach

In the past, approaching this lock from the other side could cause a little frisson of fear. One time, early in our boating career, we rounded the corner and could see the stretch between the bridge and the lock completely lines with waiting boats. It took 3 hours to get through. There has often been a queue waiting to go up here, and whilst the lock still fills very slowly, there was nobody else around.

There are a number of very attractive mooring spots along this part of the Middlewich. The canal passes over the infant River Weaver on an embankment and aqueduct, then contours along the valley looking down onto the river. There a number of formal mooring sites with mooring rings to make life easy. I chose the first one, by the aqueduct. I was all settled in before I realised that phone signal was almost non-existent. It was too hot to bother doing anything about that.

Middlewich Branch mooring
Middlewich Branch mooring
Even better mooring
Even better mooring

I left that until today. There’s a number things I need phone and internet to sort out, so I shuffled a mile along to an even better view of the river and Church Minshull, with the added advantage of decent phone signal. (Little hint: try mooring just off the end of the official mooring, after the 48h mooring limit. You will need to use spikes, but there isn’t a stone ledge under the water line that makes for a bumpy night).

Relaxing with the view
Relaxing with the view

This is a busy canal. We’ve only been moored here about 4 hours and at least 15 boats have gone past in both directions. And we’ve finally had a proper thunderstorm.